312.566.7201

The Foundry Printers Row, The Foundry Union Station – CrossFit

View Public Whiteboard

Warm – Up (No Measure)

1x

20 Mountain Climbers

15 Air Squats

10 Push-ups

1x

15 Banded Good Mornings

10 Air Squats

5 Inch Worms w/ Push-up

15 Banded Good Mornings

Deadlift (7 x 2 @ 80% +)

*Sets to be completed on a 2:00 clock

*First set to be completed at 80% of 1RM

*Build weight across working sets

****DO NOT DROP FROM TOP OF SECOND REP – Lower it down and get stronger.

Metcon (AMRAP – Reps)

Teams of 3 – 10 Rounds – 2:00 Work | :15 Transition

Station 1 – Push-ups – P1 – 5 / P2 – 5 / P3 – 5

Station 2 – Wallballs – 10/10/10

Station 3 – Pull-ups – 5/5/5

Station 4 – Sled Push (45lb Plate) – 10m

Station 5 – Sit-ups – 10/10/10
*Teams of 3 will work 2:00 at each station for reps.

*Athletes will trade reps as designated for each movement.

*Score = Total Reps and Meters

*Pull-up sub should be ring rows unless transition in and out of band is smooth and not time consuming.